UPSC Prelims 2024 CSAT, question 7

Topic: Arithmetic

Q7

A certain number of men can complete a piece of work in 6k6k days, where kk is a natural number. By what percent should the number of men be increased so that the work can be completed in 5k5k days?

  1. (a) 10%
  2. (b) (50/3)%
  3. (c) 20%Correct answer
  4. (d) 25%

Solution.

Answer: (c) 20%

  1. Let the initial number of men be M1M_1 and the increased number of men be M2M_2. Keeping total man-days constant gives M1×6k=M2×5kM_1 \times 6k = M_2 \times 5k, so M2M1=65=1.2\frac{M_2}{M_1} = \frac{6}{5} = 1.2.
  2. Therefore, the number of men must be increased by (1.2−1)×100%=20%(1.2 - 1) \times 100\% = 20\%.